Home | Public Notices | Links | Subscribe | Follow us on Facebook!
Chisago County Press | Lindstrom, MN
HOME
• Home
CORONAVIRUS
• National Headlines
• CDC Microsite
SERVICE DIRECTORY
• SERVICE DIRECTORY
AUCTIONS
• AUCTIONS
COUPONS
• COUPONS
EVENTS
• EVENTS
ANNOUNCEMENTS
• ENGAGEMENTS
• BIRTHDAYS
• ANNOUNCEMENTS
• ANNIVERSARIES
GARAGE SALES
• UPCOMING SALES
DISPLAY ADS
• DISPLAY ADS
HELP WANTED
• HELP WANTED
• JOB OPENINGS
ABOUT US
• Our Location
• Our Staff
• Subscription Rates
• Our History


5 loaves
Wagner Chiropractic
Koehn Auto


WIld Mountain 12-8-13

home : public notices : legals-article
January 15, 2021

11/12/2020 10:14:00 AM
CHISAGO LAKES JOINT SEWAGE TREATMENT COMMISSION - ADVERTISEMENT FOR BIDS: Chisago Lift Station, Andrews, SCADA and WWTF Improvements:

(November 12, 19, 2020)

Sealed Bids will be received by the Chisago Lakes Joint Sewage Treatment Commission at the Wastewater Treatment Facility, 31505 Lofton Avenue, Chisago City, MN 55013, at the WWTF office until 1 p.m., CST, Tuesday, December 8, 2020. HAND DELIVER - DO NOT MAIL. The bids will be publicly opened and read aloud for the furnishing of all labor, materials, and all else necessary for the following:

Chisago Lift Station, Andrews, SCADA and WWTF Improvements:

This project is financed using a loan from the Minnesota Public Facilities Authority. Contractors shall comply with all loan requirements. Prevailing wages are required.

In general, the Project shall consist of the following major tasks for the Sanitary Sewer District Facilities:

Chisago City Lift Station
1 LS Modifications to existing Chisago City lift station.
1 LS Furnish and Install new control panel at Chisago City Lift station.
1 LS Modifications to existing generator at Chisago Lift Station.
1 LS Remove and replace valves ion existing valve vault.
1 LS Electrical service modification from 240 volt to 480volt service, temporary wiring as required for modifications.
2 EA Re-wire existing 240 volt pumps to function on 480volt service.
1 EA Re-wire existing generator from 240 volt to 480volt output.
1 LS Temporary conveyance required to complete valve vault modifications.

Andrews Lift Station
1 LS Modifications to existing Andrews lift Station.
1 LS Furnish and Install new control panel at Andrews City Lift station.
1 LS Remove existing generator and furnish and install new generator.
2 EA Remove and replace existing pumps with larger pumps on new 480volt service.
1 LS Remove and replace valves ion existing valve vault.
1 LS Temporary conveyance of wastewater required to complete valve vault and wet well modifications.

WWTF Effluent Pump Replacement
1 LS Removed existing skid mount effluent pump system and replace with specified effluent pump system.

SCADA Modifications
1 LS Replace specified telemetry and control equipment at the following additional sites. Stacy Lift Station, Co. Road 22 Lift Station and Co. Road 84 Lift Station.

Along with miscellaneous site and utility improvements, removals, restoration and correlated appurtenances.
Complete digital Bidding Documents are available at www.questcdn.com for $20 by inputting QuestCDN eBidDoc # 7399310 on the website’s Project Search page. Paper Bidding Documents may also be viewed at the Sanitary Sewer District Treatment Plant at 31505 Lofton Avenue, Chisago, MN 55013, (651) 257-1937.

Direct inquiries to Engineer’s Project Manager Daryl Kirschenman at (612) 240-7402.

Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders.

The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids.

The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner.

The Commission is tentatively scheduled to consider award of a contract for this work at their regular meeting to be held on Monday, December 21st at 5:30 p.m. in the City of Lindstrom Council Chambers at 1392 Sylvan Avenue, Lindstrom MN 5504

Zach Meyers
WWTF Superintendent
Chisago Lakes Joint Sewage Treatment Commission





Article Comment Submission Form
Please feel free to submit your comments.

Article comments are not posted immediately to the Web site. Each submission must be approved by the Web site editor, who may edit content for appropriateness. There may be a delay of 24-48 hours for any submission while the web site editor reviews and approves it.

Note: All information on this form is required. Your telephone number is for our use only, and will not be attached to your comment.
Submit an Article Comment
First Name:
Required
Last Name:
Required
Telephone:
Required
Email:
Required
Comment:
Required
Passcode:
Required
Anti-SPAM Passcode Click here to see a new mix of characters.
This is an anti-SPAM device. It is not case sensitive.
   


Advanced Search







Life
WIld Mountain 12-8-13

CHISAGO LAKES LIVING | Home | Public Notices | Links | Subscribe
Chisago County Press
P.O. Box 748 Lindstrom, MN 55045

Software © 1998-2021 1up! Software, All Rights Reserved