Home | Contact Us | Subscribe | Follow us on Facebook!
Chisago County Press | Lindstrom, MN
HOME
• Home
CORONAVIRUS
• National Headlines
• CDC Microsite
SERVICE DIRECTORY
• SERVICE DIRECTORY
AUCTIONS
• AUCTIONS
COUPONS
• COUPONS
EVENTS
• EVENTS
ANNOUNCEMENTS
• ENGAGEMENTS
• BIRTHDAYS
• ANNOUNCEMENTS
• ANNIVERSARIES
GARAGE SALES
• UPCOMING SALES
DISPLAY ADS
• DISPLAY ADS
HELP WANTED
• HELP WANTED
• JOB OPENINGS
ABOUT US
• Our Location
• Our Staff
• Subscription Rates
• Our History


5 loaves
Koehn Auto
face it
Wagner Chiropractic
J Hempel


Tom Kieffer Farmers Insurance

home : public notices : legals-article
May 26, 2022

1/6/2022 11:00:00 AM
CITY OF SHAFER, CHISAGO COUNTY, MN - ADVERTISEMENT FOR BIDS: WATER TOWER & UTILITY IMPROVEMENTS

(January 6, 20, 2022)

The City Of Shafer will receive and accept bids ONLY through QuestCDN.com via the online electronic bid service (QuestvBid) for the construction of Water Tower & Utility Improvements project until January 27, 2022 at 2:00 p.m. All bids will be downloaded and publicly read aloud during a virtual public bid opening that will be held at the day and time of the bid closing. All planholders will receive information via Quest on how to join the virtual meeting prior to the bid opening.

A pre-Bid conference will be held at 2:00 p.m., local time on January 18, 2021 at 17656 303rd Street, Shafer, MN (City Hall). Representatives of OWNER and ENGINEER will be present to discuss the Project. Bidders for both bids are encouraged to attend and participate in the conference.
The work for which bids are asked includes the following:

• Bid #1 Utility Improvements - Installation of 12-inch watermain, additional connection to water tower standpipe, miscellaneous utility adjustments, and restoration.

• Bid #2 Tower Reconditioning — Complete coating removal and replacement of all exterior and wet interior surfaces, and spot repair for an existing 75,000 gallon elevated steel hydrocone water tower, tower electrical replacements and restoration.

The anticipated substantial completion date is July 29, 2022 (Bid #1), September 9, 2022 (Bid #2) and final completion date is September 30, 2022.

Planholders list will be updated interactively on our web address at http://www. msa-ps.com under Bidding.

Copies of the BIDDING DOCUMENTS are available at www.questcdn.com. QuestCDN Vbid system requires Bidders to purchase BIDDING DOCUMENTS from QuestCDN. You may download the digital plan documents for $40.00 by inputting Quest eBidDoc #8092906 on the website’s Project Search page. Please contact QuestCDN.com at 952-233-1632 or info@questcdn.com for assistance in free membership registration, downloading, and working with the digital project information.

No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract.

BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Lucas Jones, PE, 60 Plato Boulevard East, Suite 140, St. Paul, MN 55107-1835. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages.

No bid may be withdrawn within 60 days after the actual date of the opening thereof.

OWNER reserves the right to waive any informalities or to reject any or all bids.

Published by the authority of the City Of Shafer.

CONSULTING ENGINEER:
MSA Professional Services, Inc.
60 Plato Blvd. East, Suite 140
St. Paul, MN 55124
Lucas Jones, PE
612-548-3132

Related Links:
• Shafer, MN





Article Comment Submission Form
Please feel free to submit your comments.

Article comments are not posted immediately to the Web site. Each submission must be approved by the Web site editor, who may edit content for appropriateness. There may be a delay of 24-48 hours for any submission while the web site editor reviews and approves it.

Note: All information on this form is required. Your telephone number is for our use only, and will not be attached to your comment.
Submit an Article Comment
First Name:
Required
Last Name:
Required
Telephone:
Required
Email:
Required
Comment:
Required
Passcode:
Required
Anti-SPAM Passcode Click here to see a new mix of characters.
This is an anti-SPAM device. It is not case sensitive.
   


Advanced Search







Life
Home | Contact Us | Subscribe | CHISAGO LAKES LIVING
Chisago County Press
P.O. Box 748 Lindstrom, MN 55045

Software © 1998-2022 1up! Software, All Rights Reserved